The City has inspected all local streets to determine what type of work is needed as well as to help prioritize the order in which streets will be repaired. With Measure A funding, during 2009, crews will resurface streets that were repaired last year.

For an overview of the Street Paving Schedule for 2009-2012 click here
Read the notices sent to property owners
Learn more about the types of work being performed.
Learn more about the construction "zones".

General Question? Email paving@ci.el-cerrito.ca.us or call the City's Paving Program Manager at 219-4155.

If you have any specific questions regarding these projects, you may contact either the City Contact or the contractor directly:
City Contacts:

  • Ryan O'Kane, Senior Civil Engineer at (510) 778-1782 or ryan.apm@gmail.com
  • Gerardo Avila, Street Paving Manager at (510) 778-1577

    Contractors:

  • AJW - call Construction Superintendent Mr. Clay MacKinney at (510) 772-0576
  • Argonaut - call Tim Anderson at (707) 542-4862
  • Rosas Brothers - call Victor Rosas at (510)534-1077
  • MCK Services - call Brian Hersh at (925) 957-9200
  • ISS - call James Wilson at (209) 579-4385
  • Valley Slurry Seal - call Jon James at (916) 373-1500
  • Gallagher & Burk Inc. - call Jon Adams at (408) 204-8000

    Scheduled work the week of Nov 16, 2009
    includes Work Citywide


    This type of work requires street closures.

    Note: This schedule is subject to modification, including method and/or timing of work to be performed. Inclement weather may delay work.

    Street Block Type of Work Work Schedule Contractor City Contact
    Kearney St Waldo to Moeser Slurry Seal 16-Nov Valley Ryan O'Kane
    Ranchito Portola to end Slurry Seal 16-Nov Valley Ryan O'Kane
    Edna St Fern to Jordan Slurry Seal 16-Nov Valley Ryan O'Kane
    Fern St Cedar to end Slurry Seal 16-Nov Valley Ryan O'Kane
    Charles Ave Sonoma to Tulare Slurry Seal 16-Nov Valley Ryan O'Kane
    Mound Ave Navallier to end Slurry Seal 16-Nov Valley Ryan O'Kane
    Gladys Ct Navallier to end Slurry Seal 16-Nov Valley Ryan O'Kane
    Elm St Potrero to Blake Slurry Seal 16-Nov Valley Ryan O'Kane
    Schmidt Ln Navallier to Lawrence Slurry Seal 16-Nov Valley Ryan O'Kane
    Kent Dr Contra Costa Dr to Kent Ct Slurry Seal 16-Nov Valley Ryan O'Kane
    Kent Ct Kent Dr to end Slurry Seal 16-Nov Valley Ryan O'Kane
    Harper St Hagen Slurry Seal 16-Nov Valley Ryan O'Kane
    School Ave s.53rd St to City limits Slurry Seal 16-Nov Valley Ryan O'Kane
    S. 53rd Cypress to Portrero Slurry Seal 16-Nov Valley Ryan O'Kane
    Sonoma St Barrett to Charles Slurry Seal 17-Nov Valley Ryan O'Kane
    Barrett Ave (NORTH SIDE) Harris to Arlington Slurry Seal 17-Nov Valley Ryan O'Kane
    Carquinez Ave Jordan to city limits Slurry Seal 17-Nov Valley Ryan O'Kane
    Alvarado Pl Mira Vista to Carquinez Slurry Seal 17-Nov Valley Ryan O'Kane
    Tamalpias Barrett to Arlington Slurry Seal 17-Nov Valley Ryan O'Kane
    Tamalpias Lagunitas to Barrett Slurry Seal 17-Nov Valley Ryan O'Kane
    Barrett Ave (SOUTH SIDE) Harris to Arlington Slurry Seal 18-Nov Valley Ryan O'Kane
    Tassajara Ave NORTH SIDE Lagunitas to city limits Slurry Seal 18-Nov Valley Ryan O'Kane
    Cutting Blvd NORTH SIDE Scenic to east end Slurry Seal 18-Nov Valley Ryan O'Kane
    Tamalpias Fairview to Cutting Slurry Seal 18-Nov Valley Ryan O'Kane
    Jordan Ave Alta Puenta to Poinsett Slurry Seal 18-Nov Valley Ryan O'Kane
    Barrett Ave (CENTER LANE) Harris to Arlington Slurry Seal 19-Nov Valley Ryan O'Kane
    Cutting Blvd (NORTH SIDE) Scenic to east end Slurry Seal 19-Nov Valley Ryan O'Kane
    Hagen Blvd Cutting to Harper Slurry Seal 19-Nov Valley Ryan O'Kane
    Moris Ave Hagen to Junction Slurry Seal 19-Nov Valley Ryan O'Kane
    Knott Ave Hagen to Key Slurry Seal 19-Nov Valley Ryan O'Kane
    Hagen Blvd Harper to Junction Slurry Seal 19-Nov Valley Ryan O'Kane
    Rifle Range Rd city limits to Atwell Slurry Seal POSTPONED Valley Ryan O'Kane
    Rifle Range Rd Arlington to Atwell Slurry Seal POSTPONED Valley Ryan O'Kane
    Brewster Ct Brewster Dr to end Slurry Seal POSTPONED Valley Ryan O'Kane
    Bel View Ct Rifle Range to end Slurry Seal POSTPONED Valley Ryan O'Kane
    Wildcat St Rifle Range to end Slurry Seal 11/19 Valley Ryan O'Kane
    Lagunitas Carquines to Arlington Slurry Seal POSTPONED Valley Ryan O'Kane
    Ohio St San Pablo Ave to end Slurry Seal POSTPONED Valley Ryan O'Kane
    Wall Ave San Pablo Ave to Kearney Slurry Seal POSTPONED Valley Ryan O'Kane
    Cresent Wy Jordan to city limits Slurry Seal POSTPONED Valley Ryan O'Kane
    Peerless Ave Cutting to parking lot Slurry Seal 11/19 Valley Ryan O'Kane
    Irma Ave Cutting to Carquinez Slurry Seal POSTPONED Valley Ryan O'Kane
    Cutting Blvd Arlington to Scenic Slurry Seal POSTPONED Valley Ryan O'Kane
    Victor Ave I-80 to city limiys Slurry Seal POSTPONED Valley Ryan O'Kane
    Cypress Ave city limitis to S.55th St Slurry Seal POSTPONED Valley Ryan O'Kane

    Scheduled work the week of Nov 23, 2009
    includes Work Citywide


    This type of work requires street closures.

    Note: This schedule is subject to modification, including method and/or timing of work to be performed. Inclement weather may delay work.

    Street Block Type of Work Work Schedule Contractor City Contact
    Stockton           Ashbury to Richmond  Slurry Seal 23-Nov Valley Ryan O'Kane
    Tulare Jordan to #2339 Slurry Seal 23-Nov Valley Ryan O'Kane
    Kent Drive (one way) Slurry Seal 23-Nov Valley Ryan O'Kane
    Donal- west end (one way) Slurry Seal 23-Nov Valley Ryan O'Kane
    Gloria Slurry Seal 23-Nov Valley Ryan O'Kane
    Charles Slurry Seal 23-Nov Valley Ryan O'Kane
    Edna Slurry Seal 23-Nov Valley Ryan O'Kane
    Fern Slurry Seal 23-Nov Valley Ryan O'Kane
    Hagen Mira Vista and West of Harper Slurry Seal 23-Nov Valley Ryan O'Kane
    Humboldt Slurry Seal 23-Nov Valley Ryan O'Kane
    Mono Slurry Seal 23-Nov Valley Ryan O'Kane
    Nason Slurry Seal 23-Nov Valley Ryan O'Kane
    Rifle Range Rd city limits to Atwell Slurry Seal 24-Nov Valley Ryan O'Kane
    Rifle Range Rd Arlington to Atwell Slurry Seal 24-Nov Valley Ryan O'Kane
    Brewster Ct Brewster Dr to end Slurry Seal 24-Nov Valley Ryan O'Kane
    Bel View Ct Rifle Range to end Slurry Seal 24-Nov Valley Ryan O'Kane
    Irma Ave Cutting to Carquinez Slurry Seal 24-Nov Valley Ryan O'Kane
    Cutting Blvd Arlington to Scenic Slurry Seal 24-Nov Valley Ryan O'Kane
    Victor Ave I-80 to city limiys Slurry Seal 24-Nov Valley Ryan O'Kane
    Cypress Ave city limitis to S.55th St Slurry Seal 24-Nov Valley Ryan O'Kane
    Lagunitas Carquines to Arlington Slurry Seal 24-Nov Valley Ryan O'Kane
    Ohio St San Pablo Ave to end Slurry Seal 24-Nov Valley Ryan O'Kane
    Wall Ave San Pablo Ave to Kearney Slurry Seal 24-Nov Valley Ryan O'Kane
    Cresent Wy Jordan to city limits Slurry Seal 24-Nov Valley Ryan O'Kane
    NO WORK 25-Nov HOLIDAY
    NO WORK 26-Nov HOLIDAY

    About the scheduled work...


    Chip Seal work will require full restrictions on Driveway, Parking and Street Access. No parking on street for the entire work day. No driveway access for the entire work day. The portion of the street being resurfced will be closed to vehicular traffic (except for emergency vehicles) for entire work day.

    Slurry Seal work will require full restrictions on Driveway, Parking and Street Access. No parking on street for the entire work day. No driveway access for the entire work day. The portion of the street being resurfced will be closed to vehicular traffic (except for emergency vehicles) for entire work day.

    *Curb & Gutter work will require limited Driveway and Parking Restrictions and Street Access may be reduced to only one way traffic at brief times during the work day. Limited Restrictions on Parking and Driveway means restrictions only in the immediate area of work (look at barricades for specific locations, dates and times).

    *Patch Pave work will require limited Driveway and Parking Restrictions and Street Access may be reduced to only one way traffic at brief times during the work day. Limited Restrictions on Parking and Driveway means restrictions only in the immediate area of work (look at barricades for specific locations, dates and times).

    *Storm Drain work will require limited Driveway and Parking Restrictions, but no street closures. Limited Restrictions on Parking and Driveway means restrictions only in the immediate area of work (look at barricades for specific locations, dates and times). Street Access may be reduced to only one way traffic at brief times during the work day.

    *Trench Paving work will require limited Driveway and Parking Restrictions and Street Access may be reduced to only one way traffic at brief times during the work day. Limited Restrictions on Parking and Driveway means restrictions only in the immediate area of work (look at barricades for specific locations, dates and times).

  •  
     
      printer friendly Printer-friendly page
    PDF documents
    require Adobe Reader
    adobe reader Free download
     
     El Cerrito Home Page
    City of El Cerrito California
    10890 San Pablo Avenue, El Cerrito, CA 94530-2323
    Tel 510 215-4300     Fax 510 215-4319
    E-Mail comments@ci.el-cerrito.ca.us

    www.el-cerrito.org

    copyright © 2000 – 2009 all rights reserved