ARCHIVED CIP Projects
2015 Slurry Seal and Curb Ramp Program
STREET IMPROVEMENT PROGRAM
Arlington Blvd Safety Improvements Project
Information about the Arlington Blvd at Madera and Brewster Drives Safety Improvements Project.
I-80/Central Ave Interchange Improvements
Information about interchange alternatives to improve traffic flow.
Central and Liberty Street Improvements
Information about improvements planned along Central Avenue between San Pablo Avenue, the Ohlone Greenway, and Liberty Street between Fairmount Avenue and Central Avenue.
Richmond-Ohlone Greenway Project
Information about the Richmond-Ohlone Greenway Closure Project which seeks to provide a continuous bicycle and pedestrian pathway.
Ohlone Greenway Natural Area and Rain Garden Project
Potrero Ave Safety Improvements Project
Information about the Potrero Ave between 55th and 56th Safety Improvements Project.
Moeser-Ashbury Safety Improvements
Moeser Lane and Ashbury Avenue Pedestrian and Bicycle Corridor Improvements information.
2014 Pavement Rehabilitation Project
Information on the City of El Cerrito's Pavement Rehabilitation Project
Castro Park Field Renovation
Information on the renovation of the athletic field at Castro Park (Norvell Ave).
Arlington and Brewster Curve Safety Improvements
Arlington Boulevard and Brewster Drive Curve Safety Improvements Project, City Project No. C3071.
2016 Microsurfacing and Curb Ramp Program
The scope of work includes installation of curb ramps, repair of localized pavement failures, sealing of cracks, application of a full street width microsurfacing treatment, and installation of the traffic striping and markings.
2021 sidewalk repair project, c3024.6
This project will rehabilitate the sidewalks including curb, gutter, and drainage piping that have been damaged by the roots of street trees at six (6) sites along San Pablo Avenue.
Link to page
GLADYS AVENUE, EL DORADO STREET, B STREET IMPROVEMENT PROJECT
The project will rehabilitate the roadway pavement, reconstruct sections of sidewalk, curb, and gutter damaged by street trees, reconstruct storm drain facilities, install new and modified curb ramps, and install enhanced traffic signing and pavement markings.